At the project peak over 1000 construction workers will be working on the new stadium.
The total construction site (including mobilization areas) will be 254,907 m2
The land (including pitch), where the Stadium will be located, is 46,780 m2
The height of the new stadium will be 54m from pitch level to the top of the roof.
There will be 227 Toilet rooms with 471 WC and 333 Wash Basins in the Stadium.
Over 120.000 m3 of Concrete will be poured during Construction of the Stadium.
Approximately 4300 tones of Steel will be used for Construction.
Approximately 3800 tones of Steel will be used for Roof Steel structure
Total glazing area is approximately 24.000 m2 in the Stadium.
The total area of the tires will be approximately 70.000 m2.
The dimensions of the football field will be 105 m x 68 m, and 7668 m2 natural turf will be used with 2201 m2 synthetic turf in Stadium