  • At the project peak over 1000 construction workers will be working on the new stadium.

  • The total construction site (including mobilization areas) will be 254,907 m2

  • The land (including pitch), where the Stadium will be located, is 46,780 m2

  • The height of the new stadium will be 54m from pitch level to the top of the roof.

  • There will be 227 Toilet rooms with 471 WC and 333 Wash Basins in the Stadium.

  • Over 120.000 m3 of Concrete will be poured during Construction of the Stadium.

  • Approximately 4300 tones of Steel will be used for Construction.

  • Approximately 3800 tones of Steel will be used for Roof Steel structure

  • Total glazing area is approximately 24.000 m2 in the Stadium.

  • The total area of the tires will be approximately 70.000 m2.

  • The dimensions of the football field will be 105 m x 68 m, and 7668 m2 natural turf will be used with 2201 m2 synthetic turf in Stadium

     